FEATURE COMMISSIONING












































        So where is commissioning   interfaced and controlled in an ever   stringent targets – are carbon   with interfaces between systems.
        management now?            more sophisticated manner that is   neutral commercial buildings a   These often do not generate off
        Pretty much every major project   changed and the commissioning   realistic target?  the shelf test sheets so require
        (and quite a few smaller ones) now   management role is perfectly placed            the production of bespoke check
        has a commissioning management   to identify and deal with any gaps in   So, tomorrow’s commissioning   sheets that again need to be
        function involved, usually bolted on   the way those systems interact.  manager must:  compiled into a proper report.
        to the main contractor’s organisation.                 a)  Have a holistic view of the different  Perhaps the real skill at this point is
        OK, so sometimes this is only because   Accepting all of that, where is   systems and be fully aware of the   making sure the report audit trails
        it gets the developer another   commissioning management   ways in which they interface. Yes, it  pass muster. An interface between
        BREEAM point, but it is more often   heading?            does mean taking time to identify   systems has two ends. Make sure
        because the project team recognise   The contention is that the following   those interfaces, being aware   the reports cover both ends!
        that the wide range of systems in a   influences will affect the role over   of their importance in proving
        building needs a particular skill set to   the next few years:  systems and acting as a co-  Of course, none of the above
        pull them all together to provide the   1.  Breadth of Focus – more and more  ordinator between the narrowly   mentions the programme aspect;
        client with a properly co-ordinated   people in the building services   focussed package managers so   and that is deliberate. It has always
        building. The fact that the function   industry are in roles where they   that the right bits of the systems   been an issue and will continue to
        does have a particular skill set not   have a very narrow view of the   come together at the right time   be so, but that is another story.
        found across the building industry   world. They have a specific work   to meet the project requirements,   Are there distinct project
        in general is underlined by the   package to look after, and they   but no one else is going to do it.  management aspects to where
        popularity of the Commissioning   must devote all their energy to   b)  Have an appreciation of the   the commissioning manager role
        Specialists Association’s (CSA)   getting those works completed   commercial aspects of the work   might be going? Is that a natural
        “Introduction to Commissioning   on time and on budget – or as   packages, but not necessarily to   progression resulting from the
        Management” training course that   near as they can get!  be concerned with the last couple  developments in the construction
        has been running for the last few   2.  Commercial Emphasis – it does   of pounds. It is more to do with   industry? The CSA feels that it is
        years. This draws interest from many   not matter what form of contract   convincing people that spending   a distinct possibility. That is why
        facets of the construction industry,   is in place, be it JCT, NEC, etc., the   a few extra pounds now to get   they are looking at extending and
        not just the commissioning industry.  importance of getting the money   the systems dovetailing correct   developing their training efforts into
          Today’s commissioning manager   right will not diminish – see 1 above.  saves money in the long term.  the project management sphere.
        needs an appreciation of many   3.  Bureaucracy – everyone hates   c)  Be on top of the paperwork! The
        different types of equipment   paperwork, right? Correct. The   adage that ‘if it isn’t written down it
        and systems – remember, the   drawback is that it is not going to   never happened’ is truer than ever   For further
        basic building environment is   go away. And it is not just that, it   before. The basic commissioning   information on the
        still provided by fans and pumps   is the complexity of it. Plonking a   of a system generates a test sheet   training programmes and other
        pushing air, chilled water and   stack of test sheets on the desk   pack. But it needs to be presented   services offered by the CSA,
        heating water around the building   will not cut it anymore.  as a proper report to identify the   please contact Secretary,
        which is all operated by electricity   4.  Building sustainability and   scope, summarise the results   Julie Parker, on 01403 754133,
        running along cables to feed   energy efficiency will be ever   and provide conclusions about   by email at office@csa.org.uk or
        control panels and lighting. It is   more important, especially as   the success (or otherwise) of the   via the website www.csa.org.uk
        the way those basic systems are   governments introduce more   exercise. The next step is dealing



                                                                                         MODERN BUILDING SERVICES JUNE 2021