There are thousands of individual pipework, ductwork & cabling   In the UK, the professional body that represents this engineering
       circuits.  These  circuits  connect  tens-of-thousands  of  terminal   world is CIBSE – The Chartered Institution of Building Services
       devices  such  as  switches,  sockets,  detectors,  taps,  data  points,   Engineers.  It  is  not  called  The  Chartered  Institution  of
       sensors,  actuators,  floor  drains,  disabled  access  buttons,  hand   M & E Engineers.
       dryers,  cameras,  card  readers,  light  fittings,  rainwater  inlets,
       breakglass units, air supply grilles and radiators.    So, we have two terms: Building Services and M & E. It could be
                                                              argued that Building Services provides no greater clarity than M
       Collectively,  these  systems  are  composed  of  hundreds-of-  & E about this incredibly diverse engineering world.
       thousands  of  individual  elements  –  from  commodities  such
       as  nuts  &  bolts,  anchors,  drop  rods,  unistrut,  cable  clips,  pipe   I  think  that  this  misses  the  crucial  point;  it  is  what  the  term
       supports and basket tray, to thermal insulation, firestopping and   Building Services does not do that makes it so much better than
       labels, through to system-specific fittings for pipework, ductwork   the term M & E.
       and cable-based systems.
                                                              This is because M & E implies a binary simplicity that does not
       Furthermore, the installation and commissioning work associated   exist; a system, and all the work associated with it, cannot just be
       with complex engineering world is undertaken by a huge range of   placed in the mechanical or the electrical pot.
       onsite, offsite, system, product, manufacturer, material, treatment
       and validation specialists; there is not just a mechanical tradesman   Let's put the physics about the flow of charged particles to one
       and an electrical tradesman.                           side for a moment. From a practical project-delivery perspective,
                                                              data, fire detection, closed-circuit television, nurse call, building
       However, many people working on the delivery of construction   management,  refuge  alarm,  public  address  and  access  control
       projects  and  in  facilities  management  still  try  to  cram  all  of   systems  are  no  closer  to  being  an  electric  mains  or  a  power
       this incredible engineering diversity into two categories – M &   installation  system  than  a  sprinkler,  medical  gas  or  fume
       E.  This  was  a  problem  five  decades  ago  when  buildings  were   extract system.
       technologically less complex. In the 21 century built environment,
       this  dysfunctional  over simplification  is  big  problem  because   Cold water, chilled water, hot water, sprinkler and central heating
       it  adversely  how  construction  projects  are  delivered  and  how   systems all contain water, but they are all fundamentally different
       buildings are used, managed, operated and maintained.  "mechanical" systems with lots of interfaces to other systems.

       We do not boil-down the complexity of structural engineering   The same principle of difference and inter-connectivity applies
       to C & B: Columns and Beams. We don't condense the richness   to ductwork-based "mechanical" systems such as ventilation and
       of architecture to W & R: Walls and Roofs. Civil Engineering is   air conditioning.
       not compressed to R & T: Roads and Tunnels. Sustainability is not
       hollowed-out to just E & M: Energy & Materials. So why would we   And so on, and so on for other Building Services systems.
       ever try to use the inappropriate abbreviation M & E for the huge
       range of systems that, in simple terms, make modern human life   In the built environment, the aim for all teams is not just to safely
       possible across the planet?                            deliver a building on-time and on-cost. Any building also needs to:
       I  am  not  sure  whether  it  is  laziness,  ignorance,  an  inferiority   •   Be operationally-ready at handover
       complex, or some other factor that has led to the corruption of   •   Perform to suit its required purpose
       this incredibly important aspect of the built environment.  •   Function efficiently and effectively in the long-term