Page 3 - CSA INDEX - Summer 2019
P. 3
Ashford Environmental Services Limited
Investment in Training Award 2019
Ashford are proud to announce they have won the Investment in Training
Award for their internal training and career development programme at the
prestigious CSA Gala Dinner in London. Ashford were also finalists in three
other categories; “Project of the Year”, “Commissioning Management Award”
and “Commissioning Provider of the Year”.
Operating from their hub in the City of London, Ashford continues to
consolidate their position as market leader in the commissioning and water
treatment sector. Based at the Dartford Depot, their maintenance division
Ashfordfm, continues to grow, providing tailored solutions to the facilities
management industry. Other milestones in the last year include certification
with Achilles, the leading supply chain management specialist; completion
of the new Tottenham Hotspur Stadium, 100 Bishopsgate and the securing
of another mega project, Battersea Power Station Phase 2.
Battersea Power Station Phase 2
Established in 1997, Ashford provides a full commissioning service
from design audit, through construction inspection, supervision and
commissioning management, to pre-commission cleaning, pre-
commissioning, pre-test and balancing checks, commissioning and
performance testing. Our aftercare service includes monitoring of water
quality, legionella control, environmental, general maintenance, post
occupancy evaluation and continuous commissioning.
If you want a fresh pro-active approach backed up by a wealth of experience
and a management philosophy of continuous improvement in service and
performance, then contact us now. One of our directors will be happy to meet
with you to discuss how Ashford can enhance the service that you provide.
Water Treatment
• Pre-commission cleaning design appraisal
• Management of filling, venting & pressure testing
• Automatic dosing equipment for filling & ongoing maintenance
• Inhibiting/biocide dosing of pressure test water
• Flushing to BSRIA BG29/2012
Tottenham Hotspur Stadium
• MDP® low effluent cleaning
• Pre-commission cleaning of closed systems
• Bio-wash processes
• Microbiological & chemical analysis
• Site survey & risk assessment
• Chlorination/disinfection to BS6700 & HSE ACOP L8
• L8 compliance & survey
• Closed system water quality monitoring & maintenance
• Boiler & cooling tower maintenance/cleaning/refurbishment
• Cooling tower decommissioning
• Supply/maintenance of water softeners
• Supply of dosing pots, air/dirt separators, sample coolers
• Tank cleaning/replacement/refurbishment
• Hevasure remote monitoring/control of dosing plant
• Corrosion rigs & coupon racks
Commissioning Services
• Commissionability appraisal
• Systems validation London Development Project
• Commissioning advisory service
• Commissioning management & supervision General Services
• Commissioning testing & balancing • LEV compliance assessment
• Commissioning documentation • Planning, procedures & specifications
• Pre-commissioning checks & fault finding • Installation co-ordination
• Plant functional analysis • Quality assurance techniques
• Environmental monitoring • Site surveys & construction supervision
• Plant operation, plant inspection & testing (site or works) • “Clerk of Works” function
Legionella
Control
Association
Member KEEPING WATER SYSTEMS SAFE

